About the role
Lead cost, planning and reporting on a multi-package rail and utilities programme valued above SAR 3 billion.
This role sits at programme level, consolidating schedules and cost reports from six delivery packages into a single source of truth for the client. You will own the earned value system, chair the monthly progress review and act as the primary interface for contractual reporting.
Key responsibilities
- Own the integrated master schedule and earned value reporting
- Consolidate cost forecasts and variance analysis across packages
- Chair monthly programme reviews with contractors and the client
- Manage a team of five planners and cost engineers
Requirements
- 12+ years in project controls on major infrastructure programmes
- Expert Primavera P6 and earned value management experience
- Degree in engineering, construction management or quantity surveying
- Gulf project experience strongly preferred
How to apply — step by step
- 1
Review the role & check eligibility
5 minutesRead the responsibilities and requirements below. This position is lead / director level, based in Riyadh and works on-site.
- 2
Prepare your documents
30–60 minutesAn updated CV (PDF, max 2 pages), a short cover note tailored to this role, and copies of qualifications or licences relevant to the position.
- 3
Submit the application form
10 minutesApply through JobOrbit and your profile is sent directly to the Sahara Infrastructure hiring team — no duplicate forms.
- 4
Screening call
Within 5 working daysA recruiter confirms your experience, notice period, salary expectation and relocation status. Usually a 20–30 minute call.
- 5
Interviews & assessment
1–3 weeksTwo to three conversations with the hiring manager and team, plus a practical task or scenario discussion relevant to the role.
- 6
Offer, contract & relocation
1–2 weeksOffer letter, reference checks, then visa and relocation paperwork handled with the employer's mobility team.
Documents you need ready
- Updated CV / résumé (PDF)
- Cover note referencing this role
- Two professional references
- Proof of highest qualification
- Valid passport (6+ months validity)
Salary breakdown
Approximately $118,000 USD per year at the top of the band.
Benefits & perks
Visa & relocation
Employer-sponsored work visa with degree attestation support, family status, annual home flights, housing allowance and end-of-service gratuity.
Saudi Arabia work permit guideJobOrbit role guide
Project Controls Manager in Riyadh: the complete guide
Everything below is written for this specific listing — the market it sits in, what the week really looks like, how the pay band works, how to prepare, and where the role leads afterwards.
Why this Project Controls Manager role exists
Sahara Infrastructure is a Construction & Skilled Trades company of 9,000+ people, founded in 1991 and headquartered in Riyadh, Saudi Arabia. Sahara Infrastructure delivers rail, utilities and mixed-use developments across Saudi Arabia and the wider Gulf. The company runs its own training academy for site supervisors and holds ISO 45001 certification across all active projects. This project controls manager vacancy sits in Riyadh and is advertised as contract, on-site.
Read the responsibilities as a symptom list. "Own the integrated master schedule and earned value reporting" sitting at the top of a project controls manager brief usually means that area is currently being done badly, late, or by someone who should be doing something else. At lead / director level you will be accountable for outcomes across several people or teams, with real influence on roadmap and hiring.
Employers in construction & skilled trades are hiring for depth over breadth, and Riyadh is one of the markets where that demand is concentrated. Riyadh sits inside that picture: Giga-projects have created sustained demand in engineering, project controls and hospitality. Get educational documents attested early — it is the most common source of onboarding delays.
A week as a Project Controls Manager at Sahara Infrastructure
The project controls manager post is fully on site in Riyadh, which suits people who prefer a clean separation between work and home, and who do their best thinking with colleagues within arm's reach.
Expect the week to be shaped by 12+ years in project controls on major infrastructure programmes: it is the thread running through the responsibilities list. Around it sit reviews, handovers and the maintenance work that keeps a construction & skilled trades operation of this size running. Ask in interview how much of the week is genuinely protected for deep work — the honest answer varies a lot between teams.
Leadership hires in Riyadh are judged on the second year, but the first year decides whether they get one. Spend it on people and on the two or three structural fixes that unlock the rest. Whatever the plan, the 12+ years in project controls on major infrastructure programmes expectation is the one that will be reviewed first.
Where the hours go in this Project Controls Manager role
- Core delivery — own the integrated master schedule and earned value reporting
- Applied 12+ years in project controls on major infrastructure programmes work and problem-solving alongside the wider team
- Review, handover and coordination with the people who depend on this role
- Maintenance, fixes and improving what already exists
- Planning, documentation and keeping current in construction & skilled trades
What SAR 32,000 – 42,000 / month really means here
The advertised range is SAR 32,000 – 42,000 / month, a spread of roughly 31% between floor and ceiling, with a midpoint near SAR 37,000. In most structured pay systems the midpoint represents someone fully performing the role, the floor someone growing into it, and the ceiling a candidate who arrives with directly transferable, hard-to-hire experience — in this case, depth in 12+ years in project controls on major infrastructure programmes.
Against a national average of SAR 20,000/mo across advertised roles in Saudi Arabia, this band reads as a Riyadh market rate rather than a national one. City comparisons cut both ways: housing and transport in Riyadh eat part of the difference, so convert the offer into what is left at the end of the month before you judge it.
If the offer lands mid-band, the productive ask is not more money today but a defined review point: what 12+ years in project controls on major infrastructure programmes evidence, by when, moves this project controls manager post to the upper band. Employers say yes to that far more often than to a flat uplift.
Beyond base pay, always confirm
- Bonus or commission structure, and whether it is discretionary or formulaic
- Pension or retirement contribution and the employer match under Saudi Arabia rules
- Health cover, including dependants
- Paid leave, public holidays and any carry-over policy
- Equity, if offered — the vesting schedule matters more than the headline value
- Commuting, parking or transit costs in Riyadh
Who gets hired as a Project Controls Manager
Assume every other shortlisted candidate matches the 12+ years in project controls on major infrastructure programmes requirement too. Your advantage has to be an organisational result — a team you built, a process you fixed, a delivery record you turned around — specific, dated and checkable.
Generic applications that could have been sent to any employer are the first ones filtered out. Cut anything from your application that would still be true of a different job.
Be honest about the requirements list. Most employers treat it as a description of the ideal candidate, not a checklist of eliminations. Meet the majority — and the core one, 12+ years in project controls on major infrastructure programmes — and applying is rational. Meet a third of them and your time is better spent elsewhere.
Preparing for the Sahara Infrastructure interviews
Build a small bank of stories before the first call: one about 12+ years in project controls on major infrastructure programmes under pressure, one about a disagreement you handled well, one about something you got wrong. Almost every question in a project controls manager process is a variation on those three.
Research Sahara Infrastructure specifically. Safety-first and process-driven, with daily toolbox talks and a no-blame incident reporting system. Site teams are multinational, and translation support is standard on major projects. Referencing how a company actually operates, rather than reciting its marketing copy, is one of the clearest signals that a project controls manager application is genuine.
Questions worth preparing for
- Why this Project Controls Manager role at Sahara Infrastructure, and why now?
- Walk me through your experience with 12+ years in project controls on major infrastructure programmes.
- Tell me about a time own the integrated master schedule and earned value reporting went wrong. What did you change?
- Tell me about a decision you got wrong and what you do differently now.
- How do you prioritise when everything is urgent?
- What would your first ninety days in Riyadh look like?
Relocating to Riyadh
If you are moving to Riyadh for this project controls manager position, treat relocation as a project with its own timeline. Visa processing, housing, schooling and banking all run in parallel, and the one that slips is usually the one you started last.
Work visas are employer-sponsored with attested degree certificates required. The Premium Residency scheme offers longer-term stay without a local sponsor.
For this specific listing: Employer-sponsored work visa with degree attestation support, family status, annual home flights, housing allowance and end-of-service gratuity.
Check shift patterns, start times, parking or transit access, and whether any part of the week can flex. On-site roles live and die on the commute, so treat it as part of the compensation. None of this is awkward to ask; recruiters filling a project controls manager post expect these questions from serious candidates.
Where a Project Controls Manager role leads next
A lead / director-level project controls manager in construction & skilled trades typically has two credible paths after two to four years: deeper specialisation, where 12+ years in project controls on major infrastructure programmes becomes the thing the organisation relies on you for, or breadth, where you take on scope across more people and more surface area.
The path also depends on the company stage. In a 9,000+-person construction & skilled trades business, breadth usually arrives faster than a formal title does — which suits some people and frustrates others.
Sahara Infrastructure operates in Riyadh, NEOM, Jeddah, Doha, which matters for a project controls manager if internal mobility or a future move out of Riyadh is part of your plan. Ask how often people actually transfer between those offices — the honest number is usually lower than the brochure suggests.
Frequently asked questions
Does this role offer visa sponsorship?
Employer-sponsored work visa with degree attestation support, family status, annual home flights, housing allowance and end-of-service gratuity.
Can I apply from outside Saudi Arabia?
Yes. International applicants are considered; you would relocate to Riyadh before or shortly after the start date.
How long does the hiring process take?
Typically three to six weeks from application to offer, depending on interview scheduling.
When does the listing close?
Applications close in 18 days. Early applications are reviewed first.
Is the salary negotiable?
The advertised band is SAR 32,000 – 42,000 / month. Final placement inside the band depends on experience and interview outcome.